A defined supply scope, from unit to spare part
Rooftop unit sourcing
Project-by-project sourcing through partner manufacturers. Confirm cooling duty, electrical supply, roof interfaces and required documentation before a unit is proposed.
Enquire about a complete unitSupporting equipment & parts
Condenser and evaporator components, fans, valves, filter driers and controls. Compatibility and the exact items included are agreed for the project.
Choose an equipment areaReplacement-part procurement
Use existing equipment details and technical documents to identify a replacement enquiry. hicool coordinates sourcing, inspection arrangements, document collection and shipment.
Prepare a parts enquiryAgree separately: Whole-vessel HVAC design, class approval, duct installation and on-site commissioning require an identified execution party and separately agreed responsibilities. This study does not establish hicool manufacture or historical delivery.
Five interfaces to agree with the vessel team
Start with the roof arrangement and the two separate air paths. The air-cooled condenser rejects heat outdoors; its airflow is not the airflow supplied to the wheelhouse.
| Interface | Historical reference | Confirm for this enquiry |
|---|---|---|
| Cabin supply / return air | 2,040 m³/h evaporator-fan airflow | Required airflow, external static pressure, supply/return openings and duct arrangement |
| Condenser ventilation | Air-cooled; 3,230 m³/h condenser airflow | Design ambient temperature, unobstructed intake/discharge and corrosion requirements |
| Electrical / controls | 440 V / 3-phase / 60 Hz; remote controller listed | Current vessel supply, protection, starting current and control connections |
| Roof / service access | Unit L × D × H: 1,109 × 934 × 613 mm | Mounting, support/load assessment, weather sealing, lifting route and service clearances |
| Condensate drainage | Drain connection and route not established | Manufacturer drain detail, discharge location and vessel-specific routing |
Rooftop-unit supply and condenser air paths
The equipment sheet distinguishes cabin-side evaporator airflow from outdoor condenser airflow. These are separate functions, not one duct duty.
Original functional schematic. Connections explain the system; line lengths and positions do not define ship routing, duct sizes, branch duties or fabrication dimensions. This is not an as-built installation drawing.
- Two units are listed per ship; this diagram describes one representative unit.
- Outdoor clearances, roof openings and supply/return duct dimensions are not established.
Prepare these four items before equipment selection
- Define the purchase. Complete rooftop unit, supporting components or specific replacement parts; state quantity and whether it is a new installation or retrofit.
- Define the operating duty. Confirm wheelhouse load, cabin airflow, available duct pressure and outdoor design conditions. The historical 10.5 kW rating is not a selected duty for your vessel.
- Check the physical interfaces. Provide roof openings, mounting dimensions, access and electrical details. Two units in the historical record do not establish a duty/standby arrangement.
- Agree the deliverables. State requested drawings, inspection and product documentation, destination and required delivery date. Documentation availability is confirmed against the proposed equipment.
Choose the equipment area for your enquiry
The selected area carries into the sourcing brief. The complete-unit route is handled through partner manufacturers.
Complete rooftop unit — project sourcing
Share your current duty, roof arrangement and utility conditions. The quotation defines the selected equipment, included accessories, documents and responsibilities.
Request a project-specific quotationSupply air & rooftop interfaces
Prepare the cabin airflow, duct pressure and roof connection drawing. The 2040 m³/h value is a historical supply-air figure; port positions are not verified.
Browse HVAC component supplyAir-cooled condenser & fan
Describe the outdoor conditions, corrosion requirements, condenser ventilation path and maintenance access. Keep the listed 3230 m³/h condenser duty separate from cabin airflow.
Explore condenser and fan sourcingCompressor parts & remote controls
Identify the installed compressor and controller from current nameplates and circuit documentation. The archived description lists one reciprocating compressor per rooftop unit.
Explore HVAC spares and controlsThe historical reference conditions
The reference lists two rooftop units per ship. Ratings below describe one unit; they are not prefilled as your requirements.
| Condition | Recorded value | Source section |
|---|---|---|
| Application / source quantity | Wheelhouse rooftop AC / 2 sets per ship | Technical description: quantity; wheelhouse cover |
| Shown equipment | 1 illustrative rooftop unit | Concept-image scope |
| Nominal cooling duty | 10.5 kW per unit | Technical description: nominal capacity |
| Listed unit consumption | Approximately 5 kW | Technical description: power consumption |
| Electrical supply | 440 V / 3-phase / 60 Hz | Technical description: power supply |
| Historical refrigerant | R404A | Technical description: refrigerant |
| Compressor | 1 reciprocating compressor; approximately 3.1 kW motor input | Technical description: compressor |
| Condenser | Air-cooled; 3230 m³/h; 0.2 kW fan motor input | Technical description: condenser |
| Evaporator fan | 1 direct-drive centrifugal fan; 2040 m³/h; 0.375 kW motor input | Technical description: evaporator fan |
| Evaporator material | Copper tubes / copper fins | Technical description: tube type |
| Envelope | 613 H × 1109 L × 934 D mm | Technical description: overall dimension |
| Control provision | Remote controller listed | Technical description: remark |
Source and visual scope
This is a third-party historical engineering study, not a verified hicool delivery reference. The source identifies wheelhouse rooftop service but has inconsistent footer identifiers. Final ship attribution, installed performance and independent incoming requirements are unresolved.
What the drawings and 3D establish
Recorded electrical, airflow and envelope values come from the rooftop-unit description. The vessel family, roof association and external unit envelope support this explanatory view. Hull dimensions, equipment coordinates, internal construction, fan arrangement, mounting, duct routes and service clearances remain illustrative. One representative unit is shown.
Prepared with AI assistance; no independent technical sign-off is recorded. Original documents and private identifiers are excluded from the public preview. Source-reuse permission remains to be established before publication.
Need selection documents, interface details or a quotation?
The application study, indicative 3D views and reference parameters are open to view. For your vessel, request the documents relevant to the proposed equipment and agreed supply scope.
- Selection data and proposed-equipment datasheets.
- Available outline and interface drawings for installation coordination.
- Applicable product or manufacturer documents, inspection requirements and a project quotation.
Document availability, confidentiality and responsibilities are confirmed for each enquiry. This illustrative study is not an approved installation drawing or evidence of a delivered project.
Prepare a document requestRequest equipment, parts or project documents
Describe your project below. Prepare a brief to download or open in your email app, then attach your drawings there. This form prepares a brief; it does not send enquiries or upload documents automatically.

