Stern Tube Bearing & Seal Replacement for Multipurpose Vessel

Published | 2 min read
Qiangbin Zhu, Founder of Hicool

Qiangbin Zhu

Founder, Hicool Machinery

Expertise: 10+ years in marine & industrial equipment sourcing. Supplies equipment with CCS, BV or ABS class certificates for vessels and industrial facilities.

Stern Tube Bearing & Seal Replacement for Multipurpose Vessel
Table of Contents

    Project Overview

    A 12,500 DWT multipurpose vessel required stern tube bearing replacement and aft shaft seal renewal during intermediate survey at a Chinese repair yard. The BV surveyor had flagged excessive bearing clearance and minor oil seepage at the aft seal during the previous annual survey.

    Challenge

    • Stern tube bearing dimensions needed to be measured after shaft withdrawal — cannot be pre-ordered to exact size
    • BV-approved bearing material required (white metal or composite)
    • Shaft seal must match existing stern tube housing dimensions precisely
    • Total drydock time allocated: 14 days (shaft work = critical path)

    Our Solution

    Hicool pre-positioned semi-finished bearing blanks at the manufacturer while the vessel was in transit to the yard:

    • Aft Stern Tube Bearing — white metal (Babbitt), BV-certified, final-machined to measured dimensions within 48 hours of shaft withdrawal
    • Forward Stern Tube Bearing — composite (Thordon-equivalent), BV-approved, machined to survey measurements
    • Aft Shaft Seal Assembly — complete lip seal unit with chromium oxide wear ring, matched to shaft diameter
    • Spare Seal Rings — 2 sets for future maintenance

    Results

    • Bearings delivered to yard within 48 hours of receiving final measurements — critical path not delayed
    • BV surveyor approved both bearings and shaft seal at installation inspection
    • Vessel completed sea trials with bearing temperature and shaft alignment within specification
    • Total stern tube component cost: 50% less than European seal OEM pricing

    Key Takeaway

    Stern tube work is always on the critical path during drydock. Pre-positioning semi-finished components and final-machining after measurement can save days of drydock time. Hicool's approach coordinates manufacturer readiness with vessel drydock timing.

    Qiangbin Zhu, Founder of Hicool

    Written by

    Qiangbin Zhu

    Founder — Taizhou Hicool Machinery Co., Ltd.

    Qiangbin has been sourcing marine and industrial equipment from China's top manufacturers since 2015. He specializes in supplying equipment with CCS, BV or ABS class certificates. He holds deep relationships with factories across Jiangsu, Zhejiang, and Shandong provinces.

    Need Help Sourcing This Equipment?

    Get quotations with classification society certification, factory test reports, and competitive FOB pricing from verified Chinese manufacturers.

    10+ Years Industry Experience
    CCS · BV · ABS Certified Products
    7–45 Days Delivery Window