Factory-audited suppliers Class certificates from the maker · CCS · BV · ABS · DNV · LR · NK · KR · RINA · RS Est. 2015 · Taizhou, Jiangsu
sales@hiqool.com +86 523-8762-5500
Request Quote

Case Studies

Multi-Vendor Annual Supply Agreement for Singapore Shipyard

Published | Updated | 2 min read
Qiangbin Zhu, Founder of Hicool

Qiangbin Zhu

Founder, Hicool Machinery

Expertise: 10+ years in marine & industrial equipment sourcing. Supplies equipment with CCS, BV or ABS class certificates for vessels and industrial facilities.

Multi-Vendor Annual Supply Agreement for Singapore Shipyard
Table of Contents

    Project Overview

    A mid-sized ship repair yard in Singapore handling 60+ vessel repairs annually needed a consolidated sourcing partner in China to replace their fragmented supply chain of 20+ individual vendors. The yard wanted to reduce procurement overhead while maintaining quality and classification compliance across multiple product categories.

    Challenge

    • 20+ Chinese suppliers — each requiring separate purchase orders, quality checks, and logistics coordination
    • Inconsistent documentation quality — some suppliers missing class certificates, leading to survey delays
    • Multiple classification societies — each vessel arrives with different class requirements
    • Unpredictable demand — repair orders often require 7-day or faster delivery

    Our Solution

    Hicool established a framework supply agreement covering 8 product categories:

    • Piping & Fittings — carbon steel, stainless steel, CuNi, various class approvals
    • Valves — gate, globe, butterfly, check valves, JIS/ANSI standards
    • Pumps & Parts — centrifugal pump spares, mechanical seals, impellers
    • Electrical Components — marine switchgear, cables, navigation lights
    • Deck Machinery Parts — winch brakes, hydraulic components, wire rope
    • HVAC Components — compressor parts, refrigerant, copper piping
    • Bearings & Seals — stern tube components, shaft seals, roller bearings
    • Instrumentation — pressure gauges, temperature sensors, level switches

    Each order is processed through Hicool's single-point system: the yard sends one PO, we source from our pre-qualified vendor network, consolidate shipments, and deliver with unified documentation packages meeting any class society requirement.

    Results (First 12 Months)

    • 147 purchase orders processed — average delivery time 18 days
    • Zero class survey rejections due to documentation issues
    • Yard's procurement staff time reduced by approximately 60%
    • Overall cost saving of 25-35% compared to previous fragmented sourcing
    • Emergency orders (10 instances): average 8-day delivery

    Key Takeaway

    Ship repair yards benefit enormously from a consolidated China sourcing partner. Instead of managing 20+ suppliers, one relationship handles procurement, quality control, classification documentation, and logistics — freeing the yard's team to focus on repair execution rather than supply chain management.

    Qiangbin Zhu, Founder of Hicool

    Written by

    Qiangbin Zhu

    Founder — Taizhou Hicool Machinery Co., Ltd.

    Qiangbin has been sourcing marine and industrial equipment from China's top manufacturers since 2015. He specializes in supplying equipment with CCS, BV or ABS class certificates. He holds deep relationships with factories across Jiangsu, Zhejiang, and Shandong provinces.

    Need Help Sourcing This Equipment?

    Get quotations with classification society certification, factory test reports, and competitive FOB pricing from verified Chinese manufacturers.

    10+ Years Industry Experience
    CCS · BV · ABS Certified Products
    7–45 Days Delivery Window